Starting on July 9th, we will start a 3-week project of paving a lot of the roads inside Styx River. The entryway and exits, the roads around the lodge and several roads on the east side of the park will be paved.
Starting on July 9th, we will start a 3-week project of paving a lot of the roads inside Styx River. The entryway and exits, the roads around the lodge and several roads on the east side of the park will be paved.